In pictures: take a peak at results of £12.2 million Grand Opera House restoration
The focal point upon entry is a new helical staircase which sets the tone for a new era for the venue which first opened its doors in 1895.
Chief executive Ian Wilson said: “Frank Matcham, who designed this building in 1895, always believed in creating the wow factor. When you sat down inside the auditorium he believed the drama should start before the curtain rose. What we’ve done today is created the drama even when you walk into the building.
Advertisement
Hide AdAdvertisement
Hide Ad“I thought the interior design of the (2006) extension was quite harsh and cold, we wanted to reverse that. The designers have done an amazing job. It’s all softened now, there’s lots of natural light.”
The theatre now boasts four bars in order to entice visitors to stay a little longer.
One of the new bars has been installed in the restored 1980 glass extension overhanging Great Victoria Street, which for many years been hidden behind the huge posters advertising performances inside the venue.
Ian said: “Each bar is different, that’s deliberate. Ticket sales are very important to us, secondary spend is also very important.
Advertisement
Hide AdAdvertisement
Hide Ad“Our preference is that customers feel comfortable and they want to dwell in the bars pre-show, interval and afterwards. I now think that those spaces are really, really comfortable.
“I think given the investment we’ve made people will want to dwell. We want this to be a full evening’s entertainment.”
The famous auditorium also got significant attention as part of the project. The paintings and decorative plasterwork have been painstakingly conserved as well as the introduction of new seating, carpets, curtains and drapes.
As part of the £12.2m project, the theatre’s technical infrastructure has been upgraded and a permanent heritage exhibition installed telling the story of the theatre.
Advertisement
Hide AdAdvertisement
Hide AdThe project was delivered by Tracey Brothers Ltd, and more than 60 sub-contractors.
Director John Tracey said during work on the auditorium they made some of interesting discoveries: “On a beam at the top of the stage, when we had our scaffolding up to redo all the painting, we discovered the names of the previous craftsmen who had all signed it when they were up there.”
The project was supported by The National Lottery Heritage Fund, Department for Communities, Arts Council NI, Foyle Foundation, Garfield Weston Foundation and The Wolfson Foundation.
Tours are set to begin from July 5 while the first show on sale is the musical ‘Six’ which is due to open on October 4.
A message from the Editor:
Advertisement
Hide AdAdvertisement
Hide AdThank you for reading this story on our website. While I have your attention, I also have an important request to make of you.
With the coronavirus lockdown having a major impact on many of our advertisers - and consequently the revenue we receive - we are more reliant than ever on you taking out a digital subscription.
Subscribe to newsletter.co.uk and enjoy unlimited access to the best Northern Ireland and UK news and information online and on our app. With a digital subscription, you can read more than 5 articles, see fewer ads, enjoy faster load times, and get access to exclusive newsletters and content. Visit https://www.newsletter.co.uk/subscriptions now to sign up.
Our journalism costs money and we rely on advertising, print and digital revenues to help to support them. By supporting us, we are able to support you in providing trusted, fact-checked content for this website.
Alistair Bushe
Editor