'Final realistic opportunity': Plans submitted to extend Northern Ireland quarry and unlock 900,000 tonnes of basalt

Strabane’s Ardstraw Quarries is seeking to expand Keady Quarry near Limavady, potentially extending its working life by around seven years

Plans have been submitted to extend a quarry near Limavady by 1.4 hectares, with the operator saying the expansion could unlock a further 900,000 tonnes of basalt.

Plans have been put forward for a 1.4-hectare extension to Keady Quarry near Limavady, which the operator says could release an additional 900,000 tonnes of basalt. Credit Planning Portalplaceholder image
Plans have been put forward for a 1.4-hectare extension to Keady Quarry near Limavady, which the operator says could release an additional 900,000 tonnes of basalt. Credit Planning Portal

The application covers the existing Keady Quarry at 121 Broad Road and proposes extending the extraction area northwards into adjoining land.

Strabane’s Ardstraw Quarries Ltd, which has operated the site since 2014, is also proposing landscaping, native species planting and restoration of the site once quarrying has ended.

A planning statement prepared by Six-West Ltd says the additional reserves could extend the quarry’s operational life by around seven years at maximum output.

Combined with reserves remaining under the existing permission, the applicant estimates extraction could continue for a further 15 to 20 years, depending on demand.

The quarry is around four kilometres east of Limavady on the western slopes of Keady Mountain. Basalt extracted from the site is processed into crushed aggregate for use in construction.

placeholder image
Read More
Record £47,891 raised to provide vital support for NI grocery and retail workers

The proposed extension would not increase the quarry’s permitted annual output, which would remain at a maximum of 135,000 tonnes.

The applicant says the proposal is intended to extend the life of the quarry rather than increase production, meaning there would be no additional daily traffic beyond levels already permitted.

Existing access arrangements and operating hours would also remain unchanged. The quarry is currently permitted to operate from 7am to 5pm on weekdays and from 7am to 1pm on Saturdays, with no working on Sundays or public holidays.

Extraction would continue through drilling and blasting, followed by crushing and screening.

Dust-control measures would include dampening roadways and continued use of the site’s wheel-washing facility.

The applicant says the extension would help maintain supplies of locally sourced construction materials while supporting employment at the quarry and across the wider supply chain.

Environmental and heritage issues have also been considered as part of the proposal.

Watercourses connected to the site ultimately drain towards the River Roe and Lough Foyle, which contain protected habitats. The applicant refers to environmental assessments carried out for an earlier planning permission and says mitigation measures would protect these areas.

A scheduled archaeological monument is located in the south-eastern part of the wider site, but the planning statement says extraction would remain at least 50 metres away.

Once quarrying is complete, a five-year restoration scheme is proposed. Materials retained on site would be used to reshape the worked areas before vegetation is allowed to become established.

The applicant describes the proposal as the “final realistic opportunity” to expand within its existing landholding, with any further expansion dependent on acquiring neighbouring land.

News you can trust since 1737
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice